1601-065-M-05-07
12 installation guide
electrical installation/primary-secondary control wiring
9ELLOW
0RIMARY
3ECONDARY
"ROWN
/RANGE
'RAY
1
2
3
4
5
6
7
8
9
1
0
1
1
1
2
1
3
1
4
1
2
3
4
5
6
7
8
9
1
0
1
1
1
2
1
3
1
4
1
2
3
4
5
6
7
8
1
2
3
4
5
6
7
8
SW2
1
2
3
4
5
6
7
8
1
2
3
4
5
6
7
8
TB 1
UP
Detector
TB 1
DOWN
Detector
3PEED"UMP
3PEED"UMP
Connect the primary/secondary operators
as shown.
1
Connect operators to its own high voltage power source, refer
to the high voltage wiring section on page10.
2
3
Connect control devices to the primary unit as described
in the Low Voltage Wiring section on page 11.
Switch Settings
•SW1 Switch 5 Off - Relay activates
with DOWN LOOP.
•SW1 Switch 6: ON - UP LOOP output
from Term 7.
•Set other switches based on gate op-
eration preferences.
•Set both operators switches to the
same settings.
1
2
2
3
3
Comments to this Manuals